Drilling the impossible

Day

October 5, 2020
Today, October 5, 2020, the new Long Beach bridge is open to traffic. This $1.47 billion project included the signature cable-stayed span replaces the adjacent Gerald Desmond arch bridge that connected the Port of Long Beach with the mainland for more than half a century. It is the second-tallest cable-stayed bridge in the U.S. and...
Continue Reading

ARCHIVE